
The gaps your current policy
doesn't close.
Transit Damage
Flatbed carrying $340K in W-flange steel beams jackknifes on I-70 westbound. Materials are sheared, bent, and scattered across 200 feet of highway. Delivery window missed. Structural steel is on back-order 14 weeks.
Staged-Material Theft
2,400 linear feet of copper wire and $180K in aluminum conduit disappear from a Phoenix staging yard over a holiday weekend. General liability responds to third-party claims only. The materials — and the three-week schedule buffer — are gone.
Weather Exposure
Forty-knot winds scatter $85K in engineered lumber across three acres of a Colorado job site. The framing package is warped, contaminated with debris, and no longer meets moisture content specs. Replacement lumber has a 6-week lead time.
Supplier Insolvency
Your precast panel fabricator files Chapter 11 with $620K of your project's custom panels in mid-production. Standard builders risk doesn't respond to financial default. The panels are undeliverable. The pour date is non-negotiable.
Losses we've
already closed.
What's covered,
to the last fastener.
In-Transit Materials
From mill gate to job site gate. Inland marine floater covers rail, truck, and intermodal. No sub-limits on steel or precast.
Staged & Stored Materials
On-site, in temporary storage, or at a laydown yard. Coverage activates from delivery confirmation, not construction start.
Price Escalation
When material costs spike beyond 5% threshold, replacement cost is covered at current market rates. No coverage gap on rising steel or lumber.
Soft Cost & Delay
Lender penalties, architect re-fees, permit re-applications, and contractor overtime triggered by covered material losses.
Supply Chain Disruption
Supplier insolvency, bankruptcy, and force majeure events. Deposit protection and custom fabrication coverage.
Policy questions,
answered plainly.
If your question isn't here, our coverage specialists respond to direct inquiries within 2 business hours.
Find out what's exposed
before the loss does.
A 20-minute audit with a materials coverage specialist. No obligation. Binding quote within 48 hours if you decide to proceed.